Dear All,
Please be informed that Subcontractor will switch the installed new main water supply pipe and sewage pipe from old system to the new and also change some new equipment. To do the work, they need to dig the road and install the pipe under the road. For which we will close the road beside cafeteria and shut off the main water supply to the following buildings on Saturday 24th June 2017 (tomorrow)
Close the road beside cafeteria (Can enter-exit AIT by gate 2)
Date: Saturday 24th June 2017
Time: 10:00-16:00
Area affected:
Shut off water supply
Date: Saturday 24th June 2017
Time: 13:00-16:00
Area affected: House 09-House 14, Cafeteria and Lawson 108
We apologize for the inconvenience that may be caused.