[Residents] Water supply shut off at SV Zone 1 and SV Zone 2

Dear Residents,

Please be informed that we have completed the laying of new water pipe line system at SV1 and SV2 and now we have to switch the water supply from old pipe line to new pipe line to conclude the work. So to conclude the work, we will shut off water supply to the following building on Monday 19th June 2017.
Date: Monday 19th June 2017
Time: 09:00 – 16:00
Area affected: SV01 – SV40
We apologize for the inconvenience that may be caused.