[Residents] Water supply shut off at SV Zone 1 and SV Zone 2

Plan for More Campus Upgrades
Dear Residents, Please be informed that we have completed the laying of new water pipe line system at SV1 and SV2 and now we have to switch the water supply from old pipe line to new pipe line to conclude the work. So to conclude the work, we will shut off water supply to the following building on Monday 19th June 2017. Date: Monday 19th June 2017 Time: 09:00 - 16:00 Area affected: SV01 - SV40 We apologize for the inconvenience that may be caused.
Read More

[Residents] Emergency electricity supply shut off this afternoon to SV1 Zone

Plan for More Campus Upgrades
Dear  Residents Please be informed that the main electricity supply cable is broken at SV12 and we need to fix it today afternoon , for which we will shut off main electricity supply to the following building SV01-SV20, Time 13:30-15:30 for 2 hours Date: 21st June 2017 (Today) Time: 13:30 -15:30 Area affected: SV01-SV20 Office of Facilities and Assets Management (OFAM)
Read More

[Residents] Dorm F Renovation

Plan for More Campus Upgrades
Dear All, Please be informed that, we have started the renovation of dorm F and is scheduled to be complete by end of August 2017. During this renovation period, there might be loud noise and also some disturbance on the pathway near to dorm F. We apologise for the inconvenience that may be caused and as well we request your kind understanding.   Office of Facilities and Asset Management (OFAM) Asian Institute of Technology P.O. Box 4, Klong Luang Pathumthani 12120 Thailand Contact No.: (66 2) 5245988  
Read More

AC unit filter cleaning service for ST10-12 and House9-28 (Friday 23th – Saturday 24th)

Plan for More Campus Upgrades
Dear Residents, Please be informed that technicians will enter ST10 - ST12 and House9 - House28  for AC unit  filter cleaning as a part of our preventive maintenance routine from Friday 23th - Saturday 24th June 2017, which would take only 10 to 15 min for 1 unit. It is advisable for the tenants to store their valuables away in a safe place to prevent them from being misplaced or damaged during the process of maintenance. For AC units cleaning; if any of the tenants find the mentioned schedule to be inconvenient, please contact call center office at 5800 to arrange for another time.
Read More

[Residents] Close the road beside Cafeteria and water supply shut off tomorrow

Plan for More Campus Upgrades
Dear All, Please be informed that Subcontractor will switch the installed new main water supply pipe and sewage pipe from old system to the new and also change some new equipment. To do the work, they need to dig the road and install the pipe under the road. For which we will close the road beside cafeteria and shut off the main water supply to the following buildings on Saturday 24th June 2017 (tomorrow) Close the road beside cafeteria (Can enter-exit AIT by gate 2) Date: Saturday 24th June 2017 Time: 10:00-16:00 Area affected:  Shut off water supply Date: Saturday 24th June 2017 Time: 13:00-16:00 Area affected: House 09-House 14, Cafeteria and Lawson 108 We apologize for the inconvenience that may be caused.
Read More

[Residents] Emeregency water supply shut off at SV1 and SV2

Plan for More Campus Upgrades
Dear Residents, In addition to the yesterdays announcement,  we were just now informed by Subcontractor that there is a major leakage in the water supply line beside SV6. As we need to fix it immediately, we will shut off water supply  today from Now -10:30 Date: Today 24th June 2017 Time: Now - 10:30 Area affected: SV06 - SV10 and SV26 - SV30 We apologize for the inconvenience that may be caused
Read More

Removal of ceiling of walkway to renovate from 26th – 29th June 2017

Plan for More Campus Upgrades
Dear All, Please be informed that subcontractor will remove the ceiling of walkway to renovate in following areas from  Monday 26th – Thursday 29th June 2017  AITCC building to Admin building Admin building to Extension building Library building to SERD building Date: Monday 26th – Thursday 29th June 2017 Time: 09:00 - 16:00 During this work period, there might be loud noise and also some disturbance on the pathway. We apologize for the inconvenience that may be caused and request your kind understanding. Thank you.
Read More

Renovation work at AIT Extension Building

Plan for More Campus Upgrades
Dear All, This is to bring to your kind attention on the following time frame of  renovation work at AIT Extension Building. 1.   Painting of hallway wall on the 2nd floor (25-24 Jun, 1- 2 Jul and 8 - 9 Jul'17) 2.   Replacement of floor tile of the walk way on the 2nd floor (18 Jul - 16 Aug'17) 3.   Replacement of the office wooden doors to glass doors (8 - 16 Aug'17) During the renovation period, there might be loud noise or other disturbance. We request your understanding and we apologise for any interruption / inconvenience. Thank you very much.