Pest & Snake Control for April of 2016

Plan for More Campus Upgrades
Note: The community are advised that they should avoid 'outside' areas which have been fogged for a period of 5 minutes once fogging is completed. Where a member of the community has requested the interior of their accommodation / office to be fogged then they should only re-enter after 2 hours Remarks of Fumigation: Dormitory will be on 29/04/2016 Academic + Zone11 will be on 30/04/2016 Pest and Weed Control Zone and Schedule Dates 1 2 3 4 5 6 Mosquito / Fly Control 29 29 30 30 30 30 Termite / Cockroach / Ant Control 1, 2 4 5 6 7, 8 9, 11 Insect Control 28 28 28 28 28 28 Rodent Prevention 29, 30 29, 30 29, 30 29, 30 29, 30 29, 30 Weevil Control 1,2…
Read More

Landscape Mowing Schedule

Plan for More Campus Upgrades
  Items Location Period 1 K-Bank - Main Entrance Gate1 1 2 Main Entrance Gate1 / AITCC / Arboretum 2-4 3 House 1-8 / SV1(1-20) / SV2(21-40) 5-6 4 InterLab / Dorm A-B / Korea House / Library / Cafeteria / Lawson's 108 Shop / Football Field 7-10 5 SERD / SET / RCC / ICT / NANO / IT 11 6 Biotech / PPT / Dumpsite / NE Canal 12-13 7 AFE / ISE / NW Canal 14-15 8 ST3 / SOM 16 9 Main Ground Field / ST4 / ST5 / SV3(41-69) 17-19 10 House 9-28 20-21 11 ST6 / ST7 / ST8 / Dorm L,M,N,Q,R,S 22-24 12 ST9-12 / West Lake / Dorm P,T,U,V,W,X,Y,Z / AIT Inter School 25-29
Read More

Ongoing construction projects on campus

Plan for More Campus Upgrades
Kindly be informed about the following ongoing construction projects on campus. As part of the water supply system improvement project, the construction of a new water storage tank with a volume of 700 m3 near to the Physical Plant building has started. We also plan to lay a new main water pipe line from golf course to the new storage tank and automatic control valves to maintain the pressure, which is scheduled to start from 15 February 2016. The water supply system improvement project is scheduled to be completed before April 2016. We are also glad to inform the campus community that a new coffee shop managed by Inthanin Coffee will be opened near the library to serve AIT community.  Kindly be informed that the construction of the coffee shop…
Read More

Landscape Sprinkler Schedule

Plan for More Campus Upgrades
Pump No.1 Service area Duration / Min. Remark. Somtum Shop Station 1. Kid International School 30 - 60 Every 2 days 2. Dormitory T,U, 30 - 40 3. Canal side to Dormitory 30 - 40 4. Somtum Lawn & Lake Side 40 - 50 5. Main Football Field 150 - 180 Pump No.2 Service area Duration / Min. Remark. House No.9 Station 1. Tar - Yai Shrine to Water tank 30 - 40 Every 2 days 2. SV3 Lawn 40 - 50 3. Cafeteria Lawn 40 - 50 4. House 13 - 14 Lawn 40 - 50 5. SV2 Lawn 40 - 60 6. SV3 (5 Valves) each . Valve     Valve 1,2,3,4,5 30 - 40 7. House 9-10 30 - 40 8. House 13 - 14 30 - 40…
Read More

Customer Satisfaction Survey

Plan for More Campus Upgrades
Office of Facilities and Assets Management (OFAM) manages the operation and maintenance of AIT infrastructure and facilities. Most of the maintenance services such as technical maintenance, janitorial services, landscape services, security services,  AITCC operations management are outsourced. OFAM asses the performance of all the contractors and facilities based on various Key Performance Indicators (KPI). One of the key indicators for their performance is customer satisfaction. Your feedback will help us to evaluate the performance of the contractors appropriately and your comments, will helps us to focus on the areas to be improved.Thereby we request all the members of AIT community to spare 5 to 10 min of your valuable time to fill in the survey questionnaires through the link below http://goo.gl/forms/L0sJuMfcb4  
Read More

Plan for More Campus Upgrades

Plan for More Campus Upgrades
Dear Members of the AIT Community, In connection with the planned "Student Mall" (which has been approved by the board but still waits for the consent of TU), the following construction will go ahead, as it needs to be completed in time for the visit of HRH Princess, tentatively in September this year. (1) Relocate the existing Police Station behind the AIT curved brick wall, to provide more decent space for the new sign board. (2) The AIT sign board on the Paholyothin will be redesigned to make it more visible to the public. (3) Footpath will be rebuilt from Paholyothin Road front, with a bicycle lane all the way to AITCC. (4) A new modern bus stop will be built with bill boards for AIT's publicity. (5) A new…
Read More

Swimming pool is open from 22nd March 2017

Plan for More Campus Upgrades
Dear All,   We are glad to inform that swimming pool renovation is now complete and will be open to the users from 22nd March 2017. The users are requested to kindly follow the below rules and regulations at Swimming pool a.      The users of the pool are only AIT community which includes AIT staff, students and their families, the visitors at AITCC.  It is strictly not for outsiders. b.      All users have to register before using the swimming pool and the swimming pool staff may also request for the AIT ID card for verification. c.       Proper swim wear is required. No outerwear including cut-offs or shorts will be allowed. d.      Food and beverages are not allowed in the pool.  e.       Bringing liquor or any intoxicating drinks is prohibited. f.        Individuals…
Read More

Dorm H Renovation

Plan for More Campus Upgrades
Dear All, Please be informed that, the renovation of dorm H has started since yesterday 20th March 2017. The renovation of the dorm H is scheduled to be completed by end of May 2017 During this renovation period, there might be loud noise or disturbance on the pathway near dorm H. In this regard, we request your kind understanding.
Read More

An announcement for a Pest Control Service Remove Beehive at behind Dorm G Tonight.

Plan for More Campus Upgrades
Dear Students, Please be informed that our Pest Control team will remove beehive behind Dorm G tonight (11 April ) from 19:30-21:00 pm. During this time, there might be bees flying around and as a safety precaution, please keep your doors and windows closed as well as your lights off. What: Beehive removal behind Dorm G Date: Tonight (11 April 2017) Time: 19:30 - 21:00 Area affected: Dorm A -Dorm K   Thank you for your kind cooperation. Office of Facilities and Asset Management (OFAM) Asian Institute of Technology P.O. Box 4, Klong Luang Pathumthani 12120 Thailand Contact No.: (66 2) 5245988
Read More

An announcement for AC unit cleaning service for ST6-ST9, Dorm U and Dorm V

Plan for More Campus Upgrades
Dear Residents, Please be informed that technicians will enter ST6-ST9, Dorm U and Dorm V  for AC unit cleaning as a part of our preventive maintenance routine from Monday 15th - Thursday 18th May 2017 We request the tenants to store their valuables away in a safe place to prevent them from being misplaced or damaged during the process of maintenance. For AC units cleaning; if any of the tenant find the mentioned schedule to be inconvenient, please contact call center office at 5800 to reschedule the time 
Read More